Flood Pump Installation Friday Evening.
Flood Pump Installation. The flood pumps will be installed on Hylton Road tomorrow (Friday) at 6:30pm. The installation and closure of the road usually lasts 3-4 hours. Road closure signage will be in place as will diversion signs to the…